Securely handle projects

“We always recommend sampling to be able to assess the result before installation.”

There are a total of five project steps from the inquiry to the installed and certified safe flooring. Timely consultation prevents unnecessary costs and risks. Furthermore, the material suitable for the respective use can be selected at the beginning of the project via sampling.

There are a total of five project steps from the inquiry to the installed and certified safe flooring. Timely consultation prevents unnecessary costs and risks. Furthermore, the material suitable for the respective use can be selected at the beginning of the project via sampling.

1

Inquiry and consultation

What standards must be observed? What risks can be minimized through corresponding measures? How can aesthetics, efficiency and sustainability be brought into line? Our experts provide current and individual consultation.

Material selection and prototype creation

Depending on the type of usage, different materials and processing forms come into question. A reliably planned compromise between aesthetics and safety must be achieved. Individually produced samples ensure this decision. If certification is desired, it will be conducted in accordance with BGIA.

2

2

Material selection and prototype creation

Depending on the type of usage, different materials and processing forms come into question. A reliably planned compromise between aesthetics and safety must be achieved. Individually produced samples ensure this decision. If certification is desired, it will be conducted in accordance with BGIA.

3

Approval and order

The approval and order follow the inspection of the sample and contact with all decision-makers. Sample texts can be delivered for tenders.

Factory-made processing

The factory-made processing occurs in the Rottenacker factory based on a concrete schedule and in accordance with the agreed upon logistics. Automation and technology that was expanded and further developed by the Federal Ministry within the scope of a research project have significantly increased capacities and production output over the past two years.

4

4

Factory-made processing

The factory-made processing occurs in the Rottenacker factory based on a concrete schedule and in accordance with the agreed upon logistics. Automation and technology that was expanded and further developed by the Federal Ministry within the scope of a research project have significantly increased capacities and production output over the past two years.

5

Material delivery and installation

The material will arrive at the construction site on the agreed upon date. It will already be completely processed, non-slip according to corresponding provisions and impregnated if needed. That means it can be installed immediately. Furhter surface work at the construction site will not be necessary.